Space Creation within an office building, London EC1

Another example of space creation within an office building. In this case, the floors above and below the 3rd floor level shown were both occupied. There was hence no room available to use a needling system and hence this method of working presented an ideal solution to the challenge at hand. Once the Engineer had provided the required steelwork section sizes, we designed the system shown in house to accommodate the sacrificial stools, twin beams and column supports.