<...back to Basements

8m deep basement of a Prestigious Building in London SW1

Formation of 8m deep basement in the completely enclosed rear garden of a prestigious building. The ground consisted of water bearing sands and gravels over clay with a seven storey building alongside. Other structural works were to take place concurrently within the main building. This project presented a challenge in terms of engineering expertise but an even greater challenge in terms of logistics for access and egress. Top down construction techniques were used to resist the considerable surcharge imposed on the basement excavation by the surrounding buildings. Placing the uppermost slab at an early stage created space to store materials whilst enabling safe working to proceed simultaneously above and below ground level.

News


Temporary & Permanent Works

Temporary and permanent works to the rear elevation of a prestigious property in London W14, to link the main house to a large proposed basement within the rear garden.  

Read more >


Temporary Works Stooling

Temporary works stooling and reinforcement for a top down slab for a new basement in Notting Hill.

Read more >


All News...

Restricted Access Piling Specialists

Find out more about our sister company

Read more >

Accredited with...