National Gallery 2004

It was proposed to install two new transfer trusses in the East and West walls of the main entrance area.  The spreader beams at ground floor level were constructed in reinforced concrete.  Sacrificial steel temporary stools were placed within the depth of the proposed beams to enable the reinforcement to be placed and the concrete beam to be formed.

< Back to Historic Structures

News


Temporary & Permanent Works

Temporary and permanent works to the rear elevation of a prestigious property in London W14, to link the main house to a large proposed basement within the rear garden.  

Read more >


Temporary Works Stooling

Temporary works stooling and reinforcement for a top down slab for a new basement in Notting Hill.

Read more >


All News...

Restricted Access Piling Specialists

Find out more about our sister company

Read more >

Accredited with...